News

<< <  Page 2 of 3  > >>

Mar 18, 2016
Category: General
Posted by: admin

AusNDT Pte Ltd

Oct 15, 2015
Category: General
Posted by: admin

Wijaya Karya

Nov 10, 2013
Category: General
Posted by: admin

NEPC

LP-1109-IDN
 

Proof Load Testing

Proof load testing is designed to ensure that items of lifting equipment can perform to the required standard in accordance with manufacturer’s guidance, by giving it a full strength test.

A proof load testing is required on installation of any lifting equipment before the item is brought into service and there may be other times in the equipment’s life where a proof testing is required, e.g.

  • following a weld repair to a structural member
  • after a complete overhaul
  • following an incident
  • periodic testing may be specified in some standards